Treseko works best when the structure is loaded in order. First solution and project; then component; then build; only then suites, test cases and executions.
The build defines the executable and reportable scope. Reports for a build should be calculated over the test cases assigned to that build, not over the entire project history.
If the team comes from spreadsheets, start with a few clear suites. There is always time to refine; the expensive mistake is starting with such a broad structure that nobody can read it.